Span the Gap Build
Every team builds one section. The car only crosses if they all connect.

About
Span the Gap Build gives every team a piece of a much bigger project: one section of a giant company bridge, built to exact customer specifications.
It is not as easy as it sounds. Teams work with limited resources, strict deadlines and communication barriers that make every conversation count.
Each team designs, decorates and brands its own section, competing for awards for the most creative engineering, the best branding and the smartest use of resources. Because every section must connect with its neighbors, teams have to agree on key measurements and keep each other informed as they build.
In the grand finale, all the sections are installed as one long bridge, and a remote-controlled vehicle drives across the entire span. Will it make it to the other side?
Learning outcomes
In Span the Gap Build, every team is both a supplier and a customer. The end goal is fully shared, so success depends on managing relationships across teams and understanding how communication, or the lack of it, affects everyone else.
Tight time and limited materials call for smart project management. Teams have to decide early how to use their resources and how to keep their neighbors in the loop. Teams that share updates early avoid nasty surprises when the sections meet.
The activity is full of powerful metaphors. It shows how cross-functional cooperation drives big-picture goals and how one weak connection can stop the whole project.
When the car finally rolls across, the shared sense of achievement is huge, and the lessons about specifications, trust and communication are easy to connect back to daily work.
Program flow
-
The specifications
Teams receive customer specifications, limited materials and the rules on how they may communicate.
-
Plan the section
Teams design their section and agree on key measurements with the teams on either side.
-
Build and brand
Teams construct, decorate and brand their section against the clock.
-
Join the span
All sections are installed together to form one long company bridge.
-
Drive across
A remote-controlled vehicle crosses the full bridge, followed by the awards.
What is included
Included
- Experienced hosts to run the program
- Bridge building materials and tools
- Customer specification briefs
- Remote-controlled vehicle for the finale
- Awards for design, branding and resource use
Not included
- Venue hire
- Food and drinks
- AV equipment
- Transportation to and from the venue
- Printing of custom materials
Frequently asked questions
What group size works best?
Anything from 10 to 500 guests, split into smaller teams.
How much time should we set aside?
Plan for around 2 hours.
Do we need engineering skills?
No. Clear specifications and materials are provided, and success comes from planning and communication.
Where can it be held?
Indoors or outdoors, whichever suits your venue and the weather on the day.
How do we know if the bridge works?
A remote-controlled vehicle drives across the full length of the finished bridge in the finale.
Request a quote for Span the Gap Build
Tell us your group size, date and goals. We will reply with a tailored proposal.

